“Piraino” photovoltaic project, located in the municipality of Alcamo (TP) with grid connection infrastructure in the municipality of Monreale (PA), Sicily, submitted by Limes 19 Srl, has successfully obtained the positive publication of Decreto VIA from MASE (MASE_ DM_2023-0000285_1).
For more information:
https://va.mite.gov.it/it-IT/Oggetti/Documentazione/8220/12089