Obtaining the “Ready-to-Build” status for a 37.1 MW photovoltaic project

Obtaining the “Ready-to-Build” status for a 37.1 MW photovoltaic project

“Piraino” photovoltaic project, located in the municipality of Alcamo (TP) with grid connection infrastructure in the municipality of Monreale (PA), Sicily, submitted by Limes 19 Srl, and developed by Studio Bordonali, has successfully obtained the Ready-to-Build status following the issuance of AU (DRS 1530 del 05/07/2024).

For more information:

https://www.regione.sicilia.it/istituzioni/servizi-informativi/decreti-e-direttive